期刊文献+

大峡水电站机组增容可行性及经济性分析

Feasibility and Economic Analysis of Capacity Increment of Hydro-generating Units of Daxia Hydropower Station
下载PDF
导出
摘要 在介绍黄河大峡水电站概况及机组改造必要性的基础上,对机组改造过程中增容的可行性及增容规模进行了分析,并通过增容后电量的计算,对增容的经济性进行了评价。结果表明,大峡水电站有进行增容的可行性,且增容在财务上可行、经济上合理,对增加系统电力电量供应,实现节能减排有积极的意义,建议尽快进行增容改造。 Based on the introduction of Daxia Hydropower Station and the necessity of hydro turbine unit modification, the technical feasibility and economy of the capacity increase during the modifica- tion of the unit are analyzed. The results show that the modification of capacity increment of hydro - generating unit of the Daxia Hydropower Station not only can enhance the power generation of old unit but also can produce obvious economic benefits. It is recommended as soon as possible hydro turbine unit modification and capacity increment.
出处 《水利科技与经济》 2017年第12期80-84,共5页 Water Conservancy Science and Technology and Economy
关键词 增容 经济性 大峡水电站 capacity increment analysis of economic benefits Daxia Hydropower Station
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部