摘要
针对双河水库坝体渗漏问题,综合考虑水库工程地质情况、施工条件及水库整体防渗等因素,提出了心墙+砂壳、斜墙+砂壳、土工膜+砂壳3种防渗加固型式,通过比选分析得出最优化的施工方案。
Taking into account the geological conditions of the reservoir engineering, construction conditions and the overall reservoir seepage and other factors, three schemes are put forward to solve the seepage of Shuanghe Reservoir: reinforcement wall with sand shell, inclined wall with sand shell and geomembrane with sand shell. The best construction scheme is determined by comparison.
出处
《水科学与工程技术》
2017年第6期27-29,共3页
Water Sciences and Engineering Technology
关键词
双河水库
坝体
防渗加固方案
土工膜
设计
Shuanghe Reservoir
dam
seepage reinforcement scheme
geomembrane
design