期刊文献+

1000 MW机组脱硝系统空预器堵灰防治 被引量:5

The prevention of the ash blocking in air preheater of the denitration system of 1000MW unit
下载PDF
导出
摘要 华电莱州发电有限公司一期选择性催化还原法(SCR)脱硝装置投运后空预器堵灰不断加剧,造成风机电耗、空预器烟气侧、一/二次风侧差压等增大,使机组的经济性不断下降,同时降低了机组出力。通过分析空预器堵灰原因,并提出一些预防措施,进而提高机组经济性。 Huadian Laizhou Power Generation Company Limitied a phase of the selective catalytic reduction(SCR) denitration device parameter is rising air preheater plugging ash.Which results in the increase in the electrical assumption of the fan,and the pressure difference between the preheater gas outlet and the primary and secondary air outlet.This would cause the decrease in the economy of the unit and unit output.In this paper,the cause of ash blocking has been analyzed,and the precautionary measures are presented to improve the economy or the unit.
出处 《华电技术》 CAS 2017年第12期56-58,61,共4页 HUADIAN TECHNOLOGY
关键词 脱硝 空预器 预防 差压 氨逃逸 denitration air preheater precautionary measures pressure difference ammonia escape
  • 相关文献

参考文献3

二级参考文献15

共引文献44

同被引文献58

引证文献5

二级引证文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部