摘要
本文以某一隧道工程为例,对整个施工工艺要点和注意事项进行了详细的介绍,其中主要包括CRD工艺特点、CRD工法原理、CRD施工流程及工艺要点、支护和施工工序说明、中隔墙拆除以及二次衬砌这6个部分。
In this paper,a tunnel project is taken as an example to introduce the key points and precautions of the whole construction process,including CRD process characteristics,CRD method,CRD construction process and key points, support and construction process description, In the demolition of the wall and the secondary lining of these six parts.
出处
《交通节能与环保》
2017年第1期81-83,共3页
Transport Energy Conservation & Environmental Protection
关键词
偏压隧道
“CRD”法施工
施工工艺
顺序探讨
biased tunnel
'CRD' method construction
construction technology
sequence discussion