摘要
结合一矿在7205工作面遇到的接替问题,通过系统分析论证,采取增加可采走向长度的措施,基本解决了队组在生产和接替中的困难,确保了矿井的正常生产。
Aiming at the relay problem at 7205 working face in No.1 Colliery,the author proposes extending the recoverable strike length,which can solve the problem in production and relay and guarantee the normal production.
出处
《江西煤炭科技》
2017年第4期14-16,共3页
Jiangxi Coal Science & Technology