基于改进CUOWGA算子-Shapley值的高铁项目施工风险评价研究 被引量:3

Research on the Risk Assessment of High Speed Railway Project Construction Based on Improved CUOWGA-Shapley Value
下载PDF
导出
摘要 高铁项目施工技术要求高、周期长、规模大,施工中面临风险众多,需要对其风险进行科学管控。在建立高铁项目施工风险评价三级指标体系基础上,将模糊语义量化应用于CUOWGA算子,考虑风险间的相关性,用改进的CUOWGA算子和Shapley值函数对高铁项目施工风险指标体系进行评价。 The high speed railway project construction with technology complexity, long cycle, large scale is faced with many risks, which need for scientific management and control of its risks. On the basis of establishing setting up the three level index system of risk assessment of high speed railway project construction, this paper applies the quantification of fuzzy semantics to the CUOWGA operator, considers the correlation between construction risks, and uses the improved CUOWGA operator and Shapley valued function to evaluate the index system of risk assessment.
出处 《建筑经济》 2017年第11期43-46,共4页 Construction Economy
关键词 高铁项目 施工风险 CUOWGA算子 SHAPLEY值 high speed railway project construction risk CUOWGA operator Shapley value
  • 相关文献

参考文献5

二级参考文献24

共引文献7

同被引文献30

引证文献3

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部