快速路建设工程是赣州市"十三五"规划期间的重点工程,快速路大部分路段采用高架方式建设,为确保各快速路的顺利对接,控制测量工作尤为关键,论文阐述了快速路网施工控制测量的方法。
The express way construction project is the key project of Ganzhou in '13 th Five-Year' planning period,most of the sections use the elevated express way construction,in order to ensure a smooth butt joint of the expressway,the control measure is particularly critical,this paper expounds the control survey method of fast road network construction.