摘要
通过求解小型水电站负荷最优分配问题的过程,阐述LINGO软件的编程方法和求解过程中的使用技巧,以解决小型水电站负荷最优分配问题,提高计算精度与缩短计算时间。
bThrough pursuing the optimum load distribution of the small-scaled hydropower station,the application skills in pursuing process and programming methods are described so that issue of the optimum load distribution of the small-scaled hydropower station is solved,calculation precision is improved and calculation time is shortened.
作者
王磊
WANG Lei(College of Water Resources and Civil Engineering,Xinjiang Agricultural University,Urumqi 830052, Chin)
出处
《西北水电》
2017年第5期91-94,共4页
Northwest Hydropower
关键词
LINGO软件
动态规划法
数学模型
负荷最优分配
小型水电站
LINGO software
dynamic planning method
mathematic model
optimum load distribution
small-scaled hydropower station