地铁工程项目建设数量日益增加,一定程度上缓解了城市交通压力。一直以来,地铁施工过程中的渗漏水问题都严重影响着工程施工进度、质量、安全,不利于工程项目施工顺利开展。论文以地铁工程项目施工过程中的渗漏水问题为研究对象,分析了渗漏水原因,并提出了防水原则,着重探讨变形缝防水、UEA无缝防水、混凝土结构自防水、螺栓孔防水和吊装孔防水、电渗漏防渗等关键技术。
The increasing number of subway project construction, to some extent, eased the urban traffic tensions. All along,the subway construction process of leakage water problems are seriously affecting the progress of construction, quality and safety,is not conducive to the smooth construction of Engineering projects. Here, the problem of water leakage in subway projects in the construction process as the research object, analyzes the reasons and puts forward Water Leakage permeability, waterproof principle, emphatically discusses the deformation joint of UEA seamless waterproof, waterproof, concrete structure from waterproof, waterproof, waterproof lifting hole bolt hole and the key technology of electroosmosis leakage seepage.
作者
付贵
FU Gui(Xi'an Underground RailwayCo.Ltd., Xi'an 710000, China)
出处
《工程建设与设计》
2017年第21期183-185,共3页
Construction & Design for Engineering
关键词
防水技术
地铁工程
渗漏水原因
防水原则
waterproof technology
subwayproject
leakage waterreason
waterproof principle