期刊文献+

金华-义乌-东阳市域轨道交通工程与既有铁路交叉节点方案研究 被引量:3

Research on Cross-node scheme of Jinhua-Yiwu-Dongyang Regional Expressed Railway project and existing railway
下载PDF
导出
摘要 随着我国城镇化建设的推进,市域轨道交通呈现快速发展势头。市域轨道交通线路与既有铁路交叉跨越的情况逐渐增多,如何处理好市域轨道交通线路与铁路交叉跨越的关系,是市域轨道交通选线设计工作的难点之一,本文从线路平、纵断面,施工工法等方面对跨铁路节点方案进行了比选,以期所得结论为其他轨道交通工程与铁路相交节点方案的选择提供参考。 With the advancement of urbanization construction in China,the Regional Expressed Railway presents rapiddevelopment momentum.The cross-crossing between urban rail transit routes and existing railways is increasing gradually,How to deal with the relationship between urban rail transit line and railways crossing is one of the difficulty in the design of regional expressed railway route selection,In this paper,the cross-Railway node scheme is selected from the aspect of railway plane line,vertical section and construction method, so as to provide reference for the choice of other rail transit projects and railway intersection nodes.
作者 徐坤 XU Kun(CHINA RAILWAY SIYUAN SURVEY AND DESIGN GROUP CO., LTD Wuhan 43006)
出处 《铁道勘测与设计》 2017年第3期41-45,共5页 Railway Survey and Design
关键词 市域轨道交通 既有铁路 选线 方案研究 regional expressed railway existing railways route selection scheme study
  • 相关文献

参考文献1

二级参考文献13

共引文献2

同被引文献17

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部