摘要
论述了新建煤矿项目初步设计优化的重要意义,煤矿建设项目工程的构成及总图运输设计在其中的重要性。通过介绍矿井总图运输设计的主要内容,以建设单位专业人员的角度,主要从矿井工业场地与其周边环境的关系、矿井工业场地各功能区域及设施之间的关系、主要建构筑物面积的优化三方面阐述了地面工程设计优化的主要内容及方法,从而促进项目工程建设的顺利实施,达到科学、经济、高效建矿的目的。
The paper discusses the meaning of preliminary design optimization and construc- tion of new mine projects and the value of design of genera/layout and transportation in the pro- jects. In the perspective of professional staff in construction units, thedesign optimization of grounding works are elaborated in terms of the relationship between industrial sites and its sur- rounding environment, the relationship between functional areas and facilities, and the area opti- mization of main buildings, so as to promote the smooth implementation of construction and to a- chieve scientific, economic and efficient construction of mine projects.
作者
赵继康
ZHAO Jikang(Jincheng Energy Investment Co. , Ltd. , State Development & Investment Corporation, Jincheng 048026, Chin)
出处
《山西煤炭》
2017年第1期20-22,共3页
Shanxi Coal
关键词
建设单位
地面工程
总图运输设计
设计优化
construction units
grounding works
design of general layout and transporta- tion
design optimization