期刊文献+

基于多类数据及模型融合的设备评价分析研究 被引量:5

Research on equipment evaluation and analysis based on multi class data and model fusion
下载PDF
导出
摘要 描述了基于多类数据及模型融合的设备评价分析方法,该方法通过结合了环境信息、运行信息、同类设备缺陷信息、在线监测等多类数据,以及通过融合了专家评价、故障模式诊断评价两个设备状态评价模型。针对不同的设备状态评价结果,为设备制定一系列的切合设备健康状况的设备运行维护策略提供支撑,制定更全面合理的运行维护策略,提高设备诊断水平,实现减小电网设备安全隐患、降低经济开支的目标。 This article descrihes the fusiun model based on class data and equipment evaluation analysis method, this method by combining the environmental information, operation information, similar equipment defect information, on - line monitoring data, and through a blend of expert evaluation, fauh diagnostic status evaluation model for evaluation of two models. Device status according to different assessment results, a series of relevant equipment for equipment support the health of the equipment operation maintenance strategy, dew.lop a more comprehensive and reasonable operation maintenance strategy, improve the level of equipment diagnosis, achieve reduce power grid equipment security hidden dariger, to reduce the economic costs of target.
作者 陈武
机构地区 曲靖供电局
出处 《电力大数据》 2017年第9期14-16,共3页 Power Systems and Big Data
关键词 状态检修 状态评价 专家评价 模糊评价 故障模式诊断 The state overhaul State evaluation Expert evaluation Fuzzy evaluatiun Fault mode diagnosis
  • 相关文献

参考文献4

二级参考文献22

  • 1刘娜,高文胜,谈克雄,梁国栋,王刘芳,李伟.大型电力变压器故障树的构建及分析[J].中国电力,2003,36(11):33-36. 被引量:17
  • 2IEC Std 6(1599.. 2007, Mineral Oil-Impregnated Electrical E- quipment in Service-Guide to the Interpretation of Dissolved and Free Gases Analysis[S]. 被引量:1
  • 3DUVAL M. Fault Gases Formed in Oil-filed Breathing EHV Power Transformer The Interpretation of Gas Analysis Data [C] // Proc. IEEE Power ENG. Soc. Conf. , [S. 1. ]: IEEE,1974. 被引量:1
  • 4Dey P. M. A risk-based model for inspection and maintenance ofcross-country petroleum pipe line [J]. Journal of QualityinMaintenance Engineering, 2001,40 (4):24-31. 被引量:1
  • 5Backlund F., Hanhu J. Can we make maintenance decisionsonriskanalysisresults [J]Joumal of Quality in Maintenance Engineering,2002, 8 (1) :77-91. 被引量:1
  • 6Khan F. I.,Haddara M. M. Risk-based maintenance: A quantitativeapproach for maintenance/inspection scheduling and planning [J].Journal of Loss Prevention in the Process Industries, 2003, 16(6):561-573. 被引量:1
  • 7Wang P. G., Zhuo H.. Research and application of equipmentmaintenance based onrisk assessment methods[J]. Electric Power In-formation Technology, 2004, 2 (11): 87-88. 被引量:1
  • 8Q/GDW171-2008,国家电网公司输变电设备状态评价导则汇编[S]. 被引量:1
  • 9余绍峰,胡文堂,陈金法,何文林,孙翔.输变电设备风险评估与维修决策[J].浙江电力,2009,28(3):1-4. 被引量:11
  • 10陈格.人工神经网络技术发展综述[J].中国科技信息,2009(17):88-89. 被引量:22

共引文献23

同被引文献55

引证文献5

二级引证文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部