5Evertsson C M,Bearman R A. Investigation Inter- particle Breakage as Applied to Cone Crushing[J]. Minerals Engineering,1997,10(2) :199-214. 被引量:1
6Evertsson C M.Modelling of Flow in Cone Crushers [J]. Minerals Engineering, 1999, 12 ( 12 ) : 1479 -1499. 被引量:1
7Evertsson C M. Output Prediction of Cone Crushers [J]. Minerals Engineering, 1998,11 (3) : 215-231. 被引量:1
8Lindqvist M, Evertsson C M. Improved Flow and Pressure Model for Cone Crushers[J]. Minerals En- gineering, 2004,17(11/12) : 1217-1225. 被引量:1
9Huang Dongming, Fan Xiumin,Wu Dianliang, et al. Multi-objective Planning of Cone Crusher Chamber, Output and Size Reduction [J]. Minerals Engin- eering, 2009,22(12) : 1091-1093. 被引量:1
10Dong Gang, Huang Dongming, Fan Xiumin. Cone Crusher Chamber Optimization Using Multiple Constraints [J]. International Journal of Mineral Processing, 2009,93 (2) :204-208. 被引量:1