摘要
介绍了公路高填方路基施工中存在的主要问题,从施工准备阶段、填方路基上料、排水处理、路基压实度检测等方面,对公路高填方路基施工技术与工艺进行了分析,从而保障施工质量。
The paper introduces the main problems in the high-filled roadbed on roads,and analyzes the high-filled roadbed construction technique and craft from the construction preparation,material load on roadbed after the filling,drainage treatment,and compaction test of the roadbed,so as to guarantee the construction quality.
出处
《山西建筑》
2017年第21期129-129,225,共2页
Shanxi Architecture
关键词
公路
高填方路基
施工技术
分层填筑技术
road
high-filled roadbed
construction technique
placement in layers