期刊文献+

非常规拆撑工序下的基坑支护设计

Foundation Pit Supporting Design in Unconventional Supportremoval Process
下载PDF
导出
摘要 支护结构作为深基坑工程中临时结构,在其使用功能终止时需要拆除,合理的拆除顺序是确保工程安全和施工进度的根本保证。文章结合工程实例,详细介绍了某基坑支护工程的拆撑工序,并对其进行受力分析,为类似工程提供参考与借鉴。 The supporting as a temporary structure in the deep foundation pit engineering, it needs to be removed when its function is terminated. Reasonable demolition order is fundamental guarantee to the project safety and construction progress. This paper introduces the supportremoval process of a foundation pit support project in detail and its stress analysis by combining with engineering examples. It provides reference for similar projects.
作者 王冰 WANG Bing(Jiangsu Hongji Energy-saving & New Technology Co.,Ltd, Nanjing Jiangsu 210031 China)
出处 《江苏建筑》 2017年第3期81-82,共2页 Jiangsu Construction
关键词 深基坑 支护结构 拆撑工序 deep foundation pit supporting structure supportremoval process
  • 相关文献

参考文献1

  • 1刘国彬编著..基坑工程手册[M].北京:中国建筑工业出版社,2009:1323.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部