1Construction Task Force Chaired by Sir John Egan(1998) Rethinking Construction. Department of Trade and Industry (DTF), London, UK. 被引量:1
2KPI Project Management Group Chaired by Keith Folwell (2004) Construction Industry Key Performance Indicaton. Constructing Excellence, London, UK. 被引量:1
3Strategic Forum for Construction Chaired by Sir John Egan (2002) Accelerating Change. Department of Trade and Industry (DTI), London, UK. 被引量:1
4Chege L W, Rwelamila P D. Risk Management and Procurement Systems An Imperative Approach, CIB W92 Procuremen System Symposium: Information and Communcation in Construction Procurement, Santiago, Chile, 2000. 被引量:1
5Thomas S N,Skitmore R M. Contractors'risks in design, novate and construct contracts [J]. International Journal of Project Management, 2002,20(3 ) : 119-126. 被引量:1
6Naoum S G, Langford D. Management contracting-the client's view [J]. Jourual of Construction Engineering and Mnagement, 1987,113(3 ) :369-384. 被引量:1
7Barrie D,Paulson B. Professional Construction Management: Including CM,Design-Construction,and General Contracting, McGraw-Hill, 1992. 被引量:1
8Pena-Mora Feniosky,Tamaki Tadatsugu. Effect of delivery systems on collaborative negotiations for large-scale infrastruction projects [J]. International Journal of Project Management, 2001,17(2) : 105-121. 被引量:1
9Lover P E D. Selecting a suitable procurement method for a building project [J]. Construction Management and Economics, 1998,16(2) : 221. 被引量:1
10Christopher M G. Choosing appropriate construction contracting method[J]. Journal of Construction Engineering and Management, 1994,120( 1 ) : 196-210. 被引量:1