摘要
通过对7600DWT散货船下水工艺的分析和计算,论述滑行、尾浮、全浮各个阶段计算的内容。介绍滑道、滑板浇敷石蜡油脂技术要求、滑板及横梁、垫木定位、下水前的准备工作、降墩及下水记录。
The launching technology of 7 600 DWT bulk carrier on longitudinal berth was analyzed, the stages of slide, lift by the stern and full floating were calculated. The design of slide way, technical requirements of pouring paraffin wax and base grease, skate boards, beams and stow-wood was introduced, as well as the preparing work before launching, records of drop pier and launching process.
出处
《船海工程》
北大核心
2017年第A01期1-4,共4页
Ship & Ocean Engineering
关键词
滑道
油脂
下水计算
slide way
paraffin
launching calculation