超长结构温度预应力筋控制裂缝施工技术研究 被引量:2

On construction techniques for controlling super-long structural temperature prestressed reinforcing steel in controlling cracks
下载PDF
导出
摘要 针对目前超长混凝土结构裂缝控制的难题,通过超长结构工程设置后浇带及温度预应力技术等综合措施,充分发挥两种技术融合的优势,对后浇带进行封闭之前,张拉预应力筋,从而实现预应力效应的充分建立;后浇带完成封闭以后,结构会形成整体受力,从而解决超长结构的裂缝问题。 According to the difficulties in controlling the super-long concrete structure in China, the paper adopts the comprehensive measures of the post-cast strip and temperature prestressed technique in the super-long structure, exerts the advantages of the two techniques, realizes the es-tablishment of the prestressed effect by stretching the prestressed steel before the enclosure of the post-cast strip, and indicates the overall stress of the structure after the enclosure of the post-cast strip, so as to solve the cracks on the super-long structure.
作者 李永魁
出处 《山西建筑》 2017年第17期89-91,共3页 Shanxi Architecture
关键词 超长结构 预应力 伸缩缝 施工工艺 super-long structure, prestress, expansion joint, construction craft
  • 相关文献

同被引文献5

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部