摘要 为计算短时温度变化引起箱形截面的伸缩量,基于分块一维热传导微分方程,提出了桥梁温度变形的近似计算方法。即将箱梁截面划分为多个矩形截面的组合,对每个矩形截面进行温度场的计算。然后,以西安西咸新区红光路沣河大桥为研究对象,原位试验测量了箱梁截面的温度和支座位移。在此基础上,基于温度谐波变化形式建立了箱梁不同区域外表面的温度随时间变化的函数,由此得到箱梁不同区域的温度和截面形心点的应变。计算结果表明,理论分析和实验位移的变化趋势相同,位移峰峰值的计算误差最大为29.2%,可供类似工程参考。 In order to calculate the expansion amount of box girder section caused by temperature change in short time, based on one-dimensional heat-conduction equation, an approximate calculation method for temperature deformation of box girder was proposed. The box girder section was divided into several rectangular regions in the method. Temperature field of each rectangular region is calculated. Then, the temperature of one box girder section and the support displacements of the Hongguang road Fenghe bridge were measured by in-situ tests. Based on the form of temperature harmonic, the function of temperature on the outer surface of the different regions of beam was constructed. Temperature of different regions of box girder and centroid strain was calculated. The results show that the support displacement has the same trend between calculation and test result. The maximum error of peak-to-peak value of the displacement is 29.2%. It can be referenced to similar projects.
作者 程曙光 程业 潘旦光 Cheng Shuguang Cheng Ye Pan Danguang(Sinohydro Engineering Bureau 15 Co., LTD., Xi' an 710068, China Department of Civil Engineering, University of Science and Technology Beijing, Beijing 100083, China)
出处 《现代交通技术》 2017年第2期16-20,共5页 Modern Transportation Technology
基金 北京市自然科学基金(项目编号:8143037) 北京科技大学教改项目(项目编号:JG2013M11)
关键词 混凝土箱梁 温度场 支座位移 原位试验 concrete box girder temperature field support displacement in-situ test
  • 相关文献

参考文献3

二级参考文献15

  • 1葛耀君,翟东,张国泉.混凝土斜拉桥温度场的试验研究[J].中国公路学报,1996,9(2):76-83. 被引量:69
  • 2樊可清,倪一清,高赞明.大跨度桥梁模态频率识别中的温度影响研究[J].中国公路学报,2006,19(2):67-73. 被引量:35
  • 3KO J M, NI Y Q. Technology Developments in Structural Health Monitoring of Large-scale Bridges [ J] . Engineering Structures, 2005, 27 (12): 1715-1725. 被引量:1
  • 4NI Y Q, HUA X G, WONG K Y, et al. Assessment of Bridge Expansion Joints Using Long-tern1 Displacement and Temperature Measurement [ J ] . Journal of Performance of Constructed Facilities, 2007, 21 (2): 143-151. 被引量:1
  • 5HUA X G, NI Y Q, KO J M, et al.Modeling of Temperaturefrequency Correlation Using Combined Principal Component Analysis and Support Vector Regression Technique [ J ] .Joumal of Computing in Civil Engineering, 2007, 21 (2): 122- 135. 被引量:1
  • 6PEETERS B, GUIDO D R. One-year Monitoring of the Z24- bridge: Environmental Effects Versus Damage Events [J] . Earthquake Engineering and Structure Dynamics, 2001, 30 (2): 149- 171. 被引量:1
  • 7WONG K Y. Instrumentation and Health Monitoring of'Cablesupported Bridges [J] . Structure Control and Health Monitoring, 2004, 11. (2) : 91 - 124. 被引量:1
  • 8COMWELL P, FARRAR C R, DOEBLING S W, et al. Environmental Variability of Modal Properties [ J] . Experimental Techniques, 1999, 23 (6): 45-48. 被引量:1
  • 9KO J M, NI Y Q.Teehnology Developments in Structural Health Monitoring of Large-scale Bridges [J] .Engineering Structures, 2005, 27 (12): 1715- 1725. 被引量:1
  • 10NI Y Q, FAN K Q, ZHENG G, et al. Automatic Modal Identification and Variability in Measured Modal Vectors of a Cablestayed Bridge [ J ] .Structural Engineering and Mechanics, 2005, 19 (2): 123-139. 被引量:1

共引文献186

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部