摘要
以掌石沟煤业15101工作面为研究对象,对其工作面积水区域进行分析,在此基础上提出工作面疏放老空水方案,并提出疏放水的相关施工要求及措施,该研究可以为掌石沟煤业及相关矿井的工作面疏放老空积水提供技术支持。
Taking 15101 Working Face of Zhangshigou Coal Industry Company as the research object, this paper analyzed the goal water area of the working face, and put forward dredging and discharge design of old goal water and related construction requirements and measures for the plan. This study provided technical support for dredging and discharge for old goaf water of Zhangshigou Coal Industry Company and other related mines.
作者
张永军
ZHANG Yongjun(Jincheng Co., Ltd., Shanxi Coal Transportation and Sales Group, Jincheng 048026, Shanxi, Chin)
出处
《能源与节能》
2017年第7期125-126,共2页
Energy and Energy Conservation
关键词
老空区积水
疏放方案
钻场布置
old goaf water
dredging and discharge plan
drilling yard layout