富阳江北水厂扩建工程工艺设计经验

Design experience of the expansion project of Jiangbei Waterworks in Fuyang
下载PDF
导出
摘要 富阳江北水厂扩建工程设计规模10×10~4m^3/d,采用折板反应平流沉淀清水池叠加、V型滤池等处理工艺,出水水质达到《生活饮用水卫生标准》(GB5749—2006)的要求。介绍了水厂扩建工程的工艺方案、工艺流程、主要设计单元参数和实际运行效果等。 Fuyang Jiangbei Waterworks expansion project design size was 10 x 104 m3/d, which the folded plate advection precipitation reaction superposition of clear water reserviors, and a V-shaped filter treatment process were used. The effluent water quality reached Standards for Drinking Water Quality( GB5749 -2006 ). The process of plant expansion project scheme, process flow, main design unit parameters and actual running effect, etc. were introduced here.
作者 汪健 王雷钧 危斌 温汝青 常鹏飞 张少国 Wang Jlan Wang Leijun Wei Bin Wen Ruqing Chang Pengfei Zhang Shaoguo(Hangzhou Fuyang Water Co.,Ltd., Hangzhou 311400, China North China Municipal Engineering Design & Research Institute Co.,Ltd., Tianjin 300074, China Datong Engineering Construction Ration Management Station, Datong 037000, China)
出处 《供水技术》 2017年第3期40-43,共4页 Water Technology
关键词 净水厂扩建 节约用地 反应沉淀池清水池叠加 waterworks expansion land conservation folded plate advection precipitationreaction superposition of clear water reserviors
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部