摘要
通过分析纳岭沟铀矿床地质条件及地浸采铀试验阶段监测井的布置原则和依据,并分析了监测井近2年来的监测数据、监测效果,最后提出纳岭沟工业项目建设时期监测井布置设想以及管理措施。
The monitoring wells arrangement principle and the evidences from experiences as well as u- ranium geological conditions for in situ leaching test in Nalinggou are analyzed and studied. The moni- toring data and monitoring results in two years are also analyzed. In the end, monitoring wells ar- rangement planning ideas and management measures in the construction stage of project are put forward,
作者
赵海军
杨敬
王如意
王兆勇
王飞
郑文娟
牛奔
李鹏
王海波
徐奇
杜自耕
ZHAO Hai-jun YANG Jing WANG Ru-yi WANG Zhao-yong WANG Fei ZHENG Wen-juan NIU Ben LI-Peng WANG Hai-bo XU Qi DU Zi-geng(Inner Mongolia Mining Co. , Ltd. , CNNC, Hohhot 010010, China)
出处
《铀矿冶》
CAS
2017年第B06期66-74,共9页
Uranium Mining and Metallurgy
关键词
监测井
布置
监测
设想
monitoring well
arrangement
monitoring
planning idea