期刊文献+

内蒙古纳岭沟铀矿床地浸采铀试验监测井设置运行及下步设想 被引量:2

Setting and Operation of Monitoring Wells for In-situ Leaching Test in Nalinggou Sandstone Uranium Deposit in Inner Mongolia and the Next Step Planning Ideas
下载PDF
导出
摘要 通过分析纳岭沟铀矿床地质条件及地浸采铀试验阶段监测井的布置原则和依据,并分析了监测井近2年来的监测数据、监测效果,最后提出纳岭沟工业项目建设时期监测井布置设想以及管理措施。 The monitoring wells arrangement principle and the evidences from experiences as well as u- ranium geological conditions for in situ leaching test in Nalinggou are analyzed and studied. The moni- toring data and monitoring results in two years are also analyzed. In the end, monitoring wells ar- rangement planning ideas and management measures in the construction stage of project are put forward,
作者 赵海军 杨敬 王如意 王兆勇 王飞 郑文娟 牛奔 李鹏 王海波 徐奇 杜自耕 ZHAO Hai-jun YANG Jing WANG Ru-yi WANG Zhao-yong WANG Fei ZHENG Wen-juan NIU Ben LI-Peng WANG Hai-bo XU Qi DU Zi-geng(Inner Mongolia Mining Co. , Ltd. , CNNC, Hohhot 010010, China)
出处 《铀矿冶》 CAS 2017年第B06期66-74,共9页 Uranium Mining and Metallurgy
关键词 监测井 布置 监测 设想 monitoring well arrangement monitoring planning idea
  • 相关文献

参考文献6

二级参考文献35

  • 1张建国,葛加明,陈绍强,齐静.新疆某砂岩铀矿碱法地浸加压溶解氧浸出试验[J].铀矿冶,2004,23(3):138-142. 被引量:21
  • 2张建国,王海峰,姜岩,王高山,李晓剑.美国碱法地浸采铀工艺技术概况[J].铀矿冶,2005,24(1):6-13. 被引量:22
  • 3Gupta C K, Singh H. Uranium resource processing, secondary resourecs [M]. Berlin: Springer,2003. 被引量:1
  • 4MeMurray J M. Worldwide uranium resources and production capacity-the future of the industry[C] //IAEA. International Symposium: Uranium Production & Raw Materials for the Nuclear Fuel Cycle,Supply and Demand, Economics, the Environmentand Energy Security. Vienna : IAEA, 2005 : 1 - 3. 被引量:1
  • 5Shatalov V V, Tarkhanov A V, Boldyrev V A, et al. Analysis of uranium world resources and ways of their extension[C] //IAEA. International Symposium: Uranium Production &. Raw Materials for the Nuclear Fuel Cycle, Supply and Demand, Econom-ies, the Environment and Energy Security. Vienna:IAEA, 2005:40 - 41. 被引量:1
  • 6Kidd S W. World uranium demand[C] // IAEA.International Symposium: Uranium Production & Raw Materials for the Nuclear Fuel Cycle, Supply and Demand, Economics, the Environment and Energy Security. Vienna: IAEA,2005:4 - 6. 被引量:1
  • 7Underhill D H. Analysis of uranium supply to 2050[M]// IAEA. The uranium production cycle and the environment. IAEA SM-362/2, Vienna:IAEA,2002:33 56. 被引量:1
  • 8Golovinsky S A, Boitsov A V. TVEL corporation-status and prospects of uranium production and resources development [C] // IAEA. International Symposium: Uranium Production & Raw Materials for the Nuclear Fuel Cycle, Supply and Demand,Economics, the Environment and Energy Security.Vienna: IAEA,2005:9 10. 被引量:1
  • 9Ganguly C. Activities on front end of uranium fuel cycle in IAEA[C] // IAEA. International Symposium: Uranium Production & Raw Materials for the Nuclear Fuel Cycle, Supply and Demand, Econom-ics, the Environment and Energy Security. Vienna:IAEA,2005 : 1 8. 被引量:1
  • 10Anon. Uranium 2003: resources, production and demand[M]. A Joint Report by the OECD Nuclear Energy Agency and the International Atomic Energy Agency. Vienna: IAEA,2004:22 - 23. 被引量:1

共引文献63

同被引文献42

引证文献2

二级引证文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部