摘要
从混凝土运输、浇筑、养护等环节,阐述了冬季桥梁工程混凝土的施工技术,提出了混凝土浇筑过程中水热化处理与浇筑周期控制措施,从而提升桥梁工程的整体性能。
From the concrete transportation, grouting, and maintenance, the paper illustrates the construction techniques for the concrete for bridge projects in winters, and points out the water heat-up treatment and grouting cycle controlling measures in the grouting process, so as to pro-mote the overall performance of the bridge projects.
出处
《山西建筑》
2017年第13期197-198,共2页
Shanxi Architecture
关键词
桥梁工程
冬季施工
混凝土
质量控制
bridge project, winter construction, concrete, quality control