深水裸岩及斜面岩河床钻孔灌注桩钢护筒施工 被引量:4

Steel casing construction methods of uncovered rock in deep water and inclined riverbed bored pile
下载PDF
导出
摘要 以S903资兴至永兴青界山公路东江大桥工程为背景,针对裸岩河床钻孔灌注桩钢护筒筒底口卷边和串浆等问题,采用了钢护筒外植筋做辅桩预固定钢护筒,钢护筒外套套筒和套筒内浇筑水下混凝土的处治方案,实践证明,该处治方案可靠有效,可为今后类似工程的施工提供借鉴。 Taking east river bridge engineering of S903 Zixing-Yongxing Qingjie mountain highway as the background, in light of uncovered river-bed bored pile steel casing bottom curling and grout leaking problems, the paper adopts steel casing reinforcement as assistant pile pre-fixing steel casing, and introduces external steel casing and internal grouting concrete processing scheme. Practice proves the above-mentioned processing scheme is reliable and effective, which will provide some guidance for similar engineering construction in future.
作者 曾治平
出处 《山西建筑》 2017年第12期78-79,共2页 Shanxi Architecture
关键词 深水裸岩 斜面岩 钻孔灌注桩 钢护筒 uncovered rock in deep water, inclined rock, bored pile, steel casing
  • 相关文献

参考文献3

二级参考文献11

共引文献10

同被引文献17

引证文献4

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部