5Bolik S M.Grid requirements challenges for wind turbines[J].Fourth International Workshop on Large Scale Integration of Wind Power and Transmission Networks for Offshore Wind Farms,Oct.2003. 被引量:1
6Electric Systems Consulting,ABB Inc.,“Integration of Wind Energy into the Alberta Electric System”,Prepared for the Alberta Electric System Operator,http://www.aeso.ca/market/6389.html. 被引量:1
7E.ON Netz,Erganzende Netzanschlussregeln für Windenergieanlagen,December 2001. 被引量:1
8Chai Chompoo Inwai,Chitra Yingvivatanapong,Kittipong Methaprayoon.Reactive compensation techniques to improve the ride-through capability of wind turbine during disturbance[J].IEEE Transactions on Industry Applications,2005,41(3):666-672. 被引量:1
9Abbey C,Joos G.Effect of low voltage ride through (LVRT) characteristic on voltage stability[J].IEEE,Transactions on Industry Applications,2005,41(3):1-7. 被引量:1
10Bing Xie,Brendan Fox,Damian Flynn.Study of fault ride-through for DFIG wind turbines[J].IEEE International Conference on Electric Utility Deregulation,Restructuring and Power Technologies,Hong Kong,April 2004:411-416. 被引量:1