基于层次分析法的建筑设计进度管理模式研究 被引量:3

Analysis on the Management Mode of Architectural Design Based on Analytic Hierarchy Process
下载PDF
导出
摘要 根据建筑设计进度管理的目标管理和专业多样性,通过搜集50个设计案例的图纸设计内容和各专业实际完成时间分析,采用层次分析法(Analytic Hierarchy Process,AHP)和工程案例分析的方法,得到各专业设计完成时间权重比,建立了适用于一般建筑设计项目的进度管理模式。 According to the goal management and professional diversity of architectural design progress management,by collecting the design contents of 50 design cases and the actual time analysis of each specialty,the method of Analytic Hierarchy Process (AHP)and engineering case analysis The professional design completion time weight ratio,established for the general architectural design project schedule management model.
出处 《科技视界》 2017年第4期252-253,共2页 Science & Technology Vision
关键词 设计进度管理 层次分析法 一致性检验 Design progress management Analytic hierarchy process Consistency test
  • 相关文献

参考文献2

二级参考文献11

  • 1Abdulaziz A. Bubshait and Ahmad Al- Abdulrazzak, "Design Quality Management Activities", journal of professional issues in engineering education and practice, p. 106, July 1996 被引量:1
  • 2Ahmed Mokhtar, Claude Bedard, and Paul Fazio, "Information Model for Managing Design Changes in a Collaborative Environment", journal of computing in civil engineering, p. 82, April 1998 被引量:1
  • 3Akintola Omigbodun, " Value Engineering And Optimal Building Projects", journal of architectural engineering , pp. 40 -41, June 2001 被引量:1
  • 4Akintola Omigbodun, " Value Engineering And Optimal Building Projects" , journal of architectural engineering, pp. 40 - 41, June 2001 被引量:1
  • 5AlbertP. C. Chan, Danny C. K. Ho, and C. M. Tam, Design And Build Project Success Factors:Multivariate Analysis, journal of construction engineering and management, p. 96, March/April 2001 被引量:1
  • 6http :// www. cces. net. cn/zhuzhai/zh/20051031. htm 被引量:1
  • 7http ://www. cces. net. cn/bzjl/bzjlml. asp 被引量:1
  • 8David Arditi and H. Murat Gunaydin, " Perceptions of Process Quality in Building Projects" , journal of management in engineering, p. 45, March/April 1999 被引量:1
  • 9Douglas D. Gransberg and Keith Molenaar, " Analysis of Owner's Design and Construction Quality Management Approaches in Design-Build Projects" , journal of management in engineering, pp. 162 - 169, October 2004 被引量:1
  • 10James L. Burati, Jr. Jodi J. Farrington and Willams B. Ledbetter, " Causes of Quality Deviation in Design and Construction", journal of Construction Engineering and Management, ASCE Vol. 118, No. 1, pp 34 - 39, March 1992 被引量:1

共引文献1

同被引文献12

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部