预应力混凝土连续梁桥合龙施工关键技术 被引量:13

Key Technologies of Closure Construction of Prestressed Concrete Continuous Girder Bridge
下载PDF
导出
摘要 以杭州—黄山高速铁路(40+2×72+40)m预应力混凝土连续梁桥为工程背景,采用有限元软件Midas Civil分析了不同合龙顺序对悬臂浇筑预应力混凝土连续梁桥成桥内力和累计施工位移的影响,探讨了平衡配重、合龙口锁定、解除临时约束等预应力混凝土连续梁桥合龙施工关键技术。结果表明,合龙顺序对连续梁桥成桥内力和累计施工位移影响较大,4跨连续梁宜采用先对称合龙中跨、再对称合龙边跨的顺序。 With the engineering background of a(40 + 2 × 70 + 40) mprstressed concrete continuous girder bridge on Hangzhou-Huangshan railway,the effects of different closure sequences on internal force and cumulative construction displacement of cantilever casting prestressed concrete continuous girder were analyzed by using Midas Civil.Some key closure construction technologies of prestressed concrete continuous girder bridge were discussed,including counterweight,locking of closure,release of temporary constraint.The results showthat the closure sequence has great influence on internal force and cumulative displacement of prestressed concrete continuous girder bridge.The continuous girder with four spans should be closed mid-span symmetrically,then closed side-span symmetrically.
作者 徐天良 XU Tianliang(China Railway Erju 6th Engineering Co., Ltd., Chengdu Sichuan 610015, China)
出处 《铁道建筑》 北大核心 2017年第4期37-39,55,共4页 Railway Engineering
关键词 铁路桥梁 合龙顺序 数值计算 连续梁桥 施工技术 Railway bridge Closure sequence Numerical calculation Continuous girder Construction technology
  • 相关文献

参考文献9

二级参考文献78

共引文献90

同被引文献77

引证文献13

二级引证文献43

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部