期刊文献+

项目施工阶段的BIM基础应用范围探讨 被引量:2

Discussion on Application Scope of BIM Foundation in Project Construction Stage
下载PDF
导出
摘要 文章通过一个地铁车辆段项目施工阶段的BIM技术应用案例分析,指出施工阶段的BIM基础应用范围为图纸核查、碰撞检查、工程算量、方案优化、三维交底等五个方面,并建议施工企业在推广应用BIM技术时,应当加强基础应用,逐渐拓展应用的深度和广度。 This paper analyzes the application of BIM technology in the construction phase of a subway depot, and points out that the application scope of BIM in the construction stage includes five aspects: drawing verification, collision inspection, engineering calculation,optimization of plan and three-dimensional payment. Enterprises should strengthen the basic application and gradually expand the depth and breadth of application in the promotion and application of BIM technology.
作者 赵传标
出处 《价值工程》 2017年第15期146-148,共3页 Value Engineering
关键词 BIM 施工阶段 基础应用 车辆段 BIM construction stage basic application vehicle depot
  • 相关文献

参考文献3

  • 1廖小烽,王君峰编著..Revit 2013/2014建筑设计火星课堂[M].北京:人民邮电出版社,2013:390.
  • 2王树友.BIM技术在施工阶段的应用研究[J].价值工程,2015,34(30):216-218. 被引量:17
  • 3丁烈云主编,龚剑,陈建国副主编,丁士昭主编..BIM应用·施工[M].上海:同济大学出版社,2015:303.

二级参考文献4

共引文献16

同被引文献9

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部