摘要
云冈煤矿从2014年开始煤炭产量逐年递减,2016年为217万t,现与矿井配套的精煤洗选能力和装车外运能力为500万t/a。为保证矿井综合效能得到充分释放,合理配置生产资源,云冈矿西山建立外来配煤系统,并得以有效实施。
The Yungang Mine coal production decreased year by year from 2014 to 2016, 2 million 170 thousand T, the mine matched clean coal washing capacity and loading and transportation capacity is 5 million T. In order to ensure the comprehensive efficiency of the mine to be fully released, the rational allocation of production resources, the external coal blending system was established and effectively implemented in Yungang Coal Mine.
出处
《山东煤炭科技》
2017年第4期172-173,175,共3页
Shandong Coal Science and Technology
关键词
外来配煤
洗选
外运
设备选型
external coal blending
washing
outside transportation
equipment selection