摘要
在杭州某项目隧道开挖支护过程中,洞内出现不明涌水导致隧道初支局部坍塌。采用在塌方导洞两侧施设咬合桩进行隔离,同时对塌方回填地面进行旋喷加固,开挖支护过程中洞内增加复拱等措施进行修复。对开挖过程中沉降进行数值模拟分析,有限元分析结果和工程中实时监测表明,该修复方案能有效控制地面沉降,具有安全性和可靠性。
In a tunnel construction in Hangzhou,unknown water swarms into tunnel leading local collapse.Set secant pile isolation on both sides of pilot and jet grouting at collapse.In the process of excavation and supporting,compound arch is used for repair.Numerical analysis of settlement is conducted.According to the finite element analysis and practice,the repair solution is safety and reliable and control the settlement.