摘要
通过分析河北省南水北调配套工程主干通信与南水北调中线总干渠的天然地理位置关系及上下游供用水关系,提出了其借用南水北调中线总干渠备用通道的必然性,通过对5种敷设方案的比选,提出了配套工程主干通信光缆最优设计方案。
Through the analysis of relationship of natural geographical position between the main canal of middle route of South-to-North water transfer project and the trunk communication optical cable of matching project in South-to-North water transfer project of Hebei province , and the relationship of water supply and consumption between upstream and downstream. It is sure that the trunk communication optical cable will be use the standby channel of the main channel. This study puts forward five scheme to ensure the optimal design scheme of the trunk communication optical cable of matching project.
作者
杨铁树
YANG Tie-shu(Hebei Research Institute of lnvestigation & Design of Water Conservancy & Hydropower, Tianjin 300250, Chin)
出处
《水科学与工程技术》
2017年第1期56-58,共3页
Water Sciences and Engineering Technology
关键词
河北省南水北调配套工程
南水北调中线总干渠
通信备用通道
树枝状通信网
微管微缆技术
the matching project of South-to-North water transfer project in Hebei province
the main canal of middle route of South-to-North water transfer project
communication standby channel
dendritic network
microtubules micro cable technology