摘要
结合工程实例,从支架设计、测量放线、条形基础施工、贝雷梁施工等方面,介绍了钢管柱贝雷梁支架法现浇连续箱梁的施工方案,并探讨了支架受力验算、排水设计、拆除等方法,为类似工程施工积累了经验。
Combining with engineering examples, starting from aspects of support design, sampling, strip foundation construction, Bailey beam construction, the paper introduces cast-in-situ continuous box girder construction scheme of steel-pile column Bailey beam support method, and explores support stress check, drainage design and demolition and other methods, which has accumulated experience for similar engineering con-struction.
出处
《山西建筑》
2017年第6期212-214,共3页
Shanxi Architecture
关键词
连续箱梁
钢管柱
贝雷梁
支架
continuous box girder, steel-pile column, Bailey beam, support