介绍了某热电厂3号冷却塔的工程概况,通过检测鉴定该冷却塔的主体结构,从底板空隙充填设计、底板加固、抗浮设计、柱加固等方面,提出了该冷却塔的加固设计方案,保证了冷却塔的安全运行。
The paper introduces the engineering survey for the No. 3 cooling tower of some thermal power plant,and points out the consolidation design scheme for the cooling tower from the bottom plate filling design,bottom plate consolidation,anti-floating design,and column consolidation,so as to ensure the safe operation of the cooling tower.
出处
《山西建筑》
2017年第2期95-96,共2页
Shanxi Architecture
关键词
热电厂
冷却塔
加固方案
底板
thermal power plant
cooling tower
consolidation scheme
bottom plate