期刊文献+

三进两回型工作面错层位布置及数值模拟

Stagger Arrangement Layout at Three-intake and Two-return Working Face and Numerical Simulation
原文传递
导出
摘要 以某矿3#煤层三进两回型工作面地质条件为背景,应用错层位巷道布置采煤法对其回采巷道进行优化布置,通过对比新方法与原方法的煤炭损失率、排瓦斯容易程度、巷道掘进与维护等方面,初步得出错层位巷道布置形式在三进两回型工作面中的独特优势。而后利用FLAC3D数值模拟研究了2种布置方案在工作面回采结束后复用巷道53022周边区域的应力、位移分布特征。数值模拟结果表明:采用错层位巷道布置不仅可以减小煤炭开采损失,而且可以大幅减小煤柱侧应力集中区,减小复用巷道顶底板移动量,利于巷道的掘进与维护。 Based on the geological conditions at 3#coal seam in a mine whose work face belongs to " three-intake two-return" ventilation type,a mining adopted roadway layout of stagger arrangement was applied to optimize the roadway layout in this coal mine.Through the comparison of coal loss ratio,easy degree of gas emission and roadway driving and maintenance of roadway in new and old approaches,the unique advantage of stagger arrangement of roadway used in " three-intake two-return" ventilation type work face had been gained preliminarily. Then,the regional stress-displacement distribution around the reuse roadway of two roadway layouts was studied by using FLAC3 Dnumerical simulation after work face extraction. The simulating results showed that the roadway layout of stagger arrangement could not only greatly reduce the loss of coal mining,but also could greatly decrease the area of lateral stress concentration of coal pillar and minish the amount of movement of roadway roof and floor. Therefore,this roadway layout method is much beneficial to the roadway's driving and maintenance.
作者 郭爱国
出处 《煤矿安全》 CAS 北大核心 2017年第1期175-178,共4页 Safety in Coal Mines
关键词 三进两回 错层位 巷道布置 数值模拟 three-intake two-return stagger arrangement roadway layout numerical modeling
  • 相关文献

参考文献9

二级参考文献21

  • 1宋选民,康天合,靳钟铭,弓培林.顶煤冒放性影响因素研究[J].矿山压力与顶板管理,1995,12(3):85-88. 被引量:24
  • 2钱鸣高,缪协兴,许家林.岩层控制中的关键层理论研究[J].煤炭学报,1996,21(3):225-230. 被引量:758
  • 3赵景礼.[D].北京:中国矿业大学(北京校区),1998. 被引量:1
  • 4布尔恰可夫A C 格林科H K 柯瓦里丘科A B.采矿工艺学[M].北京:煤炭工业出版社,1982.386~388. 被引量:1
  • 5靳钟铭.放顶煤开采理论与实践[M].北京:煤炭工业出版社,2001.253-254. 被引量:1
  • 6赵景礼 孟宪锐.综放开采可持续发展的探索[J].矿山压力与顶板管理,1998,:29-31. 被引量:4
  • 7李云豪.[D].北京:中国矿业大学(北京校区),2003,41~50. 被引量:1
  • 8赵景礼 吴健.厚煤层错层位巷道布置采全厚采煤法[P].中国专利:ZL98100544.6.2002-01-23. 被引量:14
  • 9吴健,赵景礼,盂宪锐.全国第三届放顶开采理论与实践研讨会论文集[C].1998. 被引量:1
  • 10[2]王飞.错层位巷道布置下工作面端头冒放性研究[D].北京:中国矿业大学(北京),2007. 被引量:1

共引文献96

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部