摘要
中国能源建设集团广东省电力设计研究院有限公司研发的新型等截面斜柱基础主柱顶面及塔腿座板倾斜处理的研究及应用是为降低送电线路基础造价,并解决施工、运行和维护中的问题。其成果在国内输电行业处领先地位,由于在结构上的创新和理论上的突破且解决了工程应用问题,获2007年度电力工程设计专有技术。
The research and application on tilting column top surface and tower leg base plate developed by Guangdong Electric Power Design Institute is to reduce the foundation cost of transmission lines and resolve construction, operation and maintenance problems. The results were initiated first in domestic transmission line industry. According to structure innovation and theoretical breakthrough, it has solved the engineering problems breakthrough, and obtained power engineering design proprietary technology in 2007.
出处
《南方能源建设》
2016年第B12期148-150,共3页
Southern Energy Construction
关键词
基础主柱
主柱顶面
塔腿座板
地脚螺栓
foundation column
top surface of the column
tower leg base plate
anchor bolt