摘要
结合虹梅南路高架工程,针对城市高架现浇盖梁施工,提出了三种不同的支架体系,并根据城市高架施工特点选择合理的施工方案,为今后类似工程的施工提供参考。
Combined with South Hongmei Road Viaduct Project and aiming at the cast-in-situ construction of capping beam of urban viaduct,three different scaffolding systems are proposed Based on the construction characteristics of urban viaduct,the suitable construction scheme is selected which can be referred for the construction of the simiIar projects
出处
《城市道桥与防洪》
2017年第1期117-119,共3页
Urban Roads Bridges & Flood Control
关键词
城市高架
盖梁
支架
无落地
销棒
urban viaduct
capping beam
scaffolding
nolanding
bars