摘要
以大强煤矿变更水土保持方案的编制为例,从防治责任范围的确定、水土流失预测、防治目标确定、防治措施布设及投资概算编制等方面介绍了可供参照的做法。
Taking the compilation of soil and water change conservation plan in Daqiang Coal Mine as an example, this article introduces the available reference from the aspects of determining the range of responsibility, soil erosion prediction 、determining the control goal, setting prevention measures, preparing the investment estimate, etc.
出处
《露天采矿技术》
CAS
2016年第11期38-41,共4页
Opencast Mining Technology
关键词
煤矿建设项目
变更
水土保持方案
coal mine construction project
change
soil and water conservation scheme