4ZHANG J T,FAN H,TANG W,et al. Planning for distributed wind generation under active management mode[J]. International Journal of Electrical Power & Energy Systems,2013,47:140-146. 被引量:1
5OCHOA L F,HARRISON G P. Minimizing energy losses:optimal accommodation and smart operation of renewable distributed generation[J]. IEEE Transaetions on Power Systems,2011,26(1 ) : 198-205. 被引量:1
6OCHOA L F,DENT C J,HARRISON G P. Distribution network capacity assessment:variable DG and active networks[J]. IEEE Transactions on Power Systems, 2010,25 ( 1 ) : 87-95. 被引量:1
7SIANO P,CHEN P,CHEN Z,et al. Evaluating maximum wind energy exp|oitation in active distribution networks[J ]. IET Generation, Transmission & Distribution, 2010,4 ( 5 ) : 598608. 被引量:1
8MARTINS V F,BORGES C L T. Active distribution network integrated planning incorporating distributed generation and load response uncertainties[J]. IEEE Transactions on Power Systems, 2011,26 (4) : 2164-2172. 被引量:1
9ZHANG S X,CHENG H Z,ZHANG L B,et al. Probabilistic evaluation of available load supply capability for distribution system[J]. IEEE Transactions on Power Systems,2013,28(3): 3215-3225. 被引量:1
10SRINIVAS M,PATNAIK L M. Adaptive probabilities of crossover and mutation in genetic algorithms[J]. IEEE Transactions on Systems,Man and Cybernetics, 1994,24(4) :656-667. 被引量:1