摘要
为提高盾构施工中管片拼装的质量水平,论文通过对北京地铁某盾构区间工程实践中出现的质量问题进行分析,找到引起这些问题的原因,并针对性地提出了应对措施,对盾构施工有很大的指导意义。
In order to improve the quality level of the shield tunneling segment assembly, relying on the analysis of the quality problems appeared in the practice of Beijing subway a shield sector project,this paper found the causes of these problems, and the proposed solution measures. This paper emphasized practical, and it has great directive significance to shield construction.
作者
蒋益
JIANG Yi(Guangdong Dianbai Construction Group Co., Ltd., Guangdong Guangzhou 525000, Chin)
出处
《工程质量》
2016年第12期48-50,共3页
Construction Quality
关键词
盾构管片
拼装质量
应对措施
shield segment: assembling quality: countermeasures