介绍了乐滩(新、老)水电站的工程概况,分析了乐滩新水电站建成后的运行情况及其存在的机组利用小时数过多,不利于电站机组检修,提出了改造该电站老厂房,利用电站弃水发电,减轻新电站机组运行压力,提高电站整体调峰能力。论述了改造工程建设的规模及效益。
An introduction was made on the general information of new and old powerhouses of Letan Hydropower Station. The operating situation of new powerhouse since it was put into operation was analyzed, based on which it was put forward that too high utilization hours led to inconvenient maintenance and repair, so the old powerhouse shall be reconstructed to utilize the surplus water for power generation, and to alleviate the operating pressure of new powerhouse, improve the total peak load regulating capacity of whole station. A discussion was made on the scale and benefit of old powerhouse reconstruction project.
出处
《广西水利水电》
2016年第6期29-31,共3页
Guangxi Water Resources & Hydropower Engineering
关键词
老厂房改造
规模
效益
乐滩水电站
Reconstruction of old powerhouse
scale
benefit
Letan Hydropower Station