摘要
安稳装置能够快速切除系统故障,确保系统稳定。笔者介绍了岩滩水电站系统安稳装置的设置、配置、安装和调试。系统增设了安稳装置,在投入运行后的多次系统、线路故障时,安稳装置均能正确动作切除机组,为电网安全和岩滩水电站电力送出提供了保障,达到了预期的效果。
This paper introduces the design, configuration, installation and commissioning of system stability con- trol device in Yantan hydropower station. The device is able to rapidly and correctly cut off units in case of sys- tem and line troubles after it is put into operation, achieving intended effect and ensuring power grid safety and power transmission from the station.
出处
《红水河》
2016年第6期105-108,共4页
Hongshui River
关键词
安稳装置
安装
调试
岩滩水电站
stability control device
installation
commissioning
Yantan hydropower station