期刊文献+

高墩大跨度曲线连续刚构梁施工阶段的横向位移研究 被引量:1

Research on Transverse Displacement of Rigid Frame Bridge with High Pier and Long Span
下载PDF
导出
摘要 曲线连续刚构桥在采用挂篮悬臂施工时,随悬臂长度的增加,主梁结构会由于弯扭耦合作用而发生不断增加的竖向和扭转变形,使得墩柱顶端发生横向偏移,主梁也随之偏移,对该横向偏移进行研究,利用力学的分析方法推导出径向偏移公式;以四川某大跨度曲线桥施工为依托,验证计算公式的可靠性. When continuous rigid frame bridge is in construction,with the increasing of the length of cantilever,girder structure will vertically deform due to the coupling effect of bending,this kind of deformation then will make top pier horizontally displaced,furthermore,primary beam also will be displaced. In this paper,taking a long span bridge in Sichuan province as an example,mechanical analysis method is used to get displacement equation and reliability of equation is verified.
出处 《兰州工业学院学报》 2016年第6期15-17,21,共4页 Journal of Lanzhou Institute of Technology
基金 国家自然科学基金项目(51368032)
关键词 曲线连续刚构桥 弯扭耦合 横向位移 结构力学法 有限元 continuous curved rigid frame bridge lateral torsional coupling lateral displacement structural mechanics method finite element
  • 相关文献

参考文献7

二级参考文献15

共引文献7

同被引文献15

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部