摘要
以查找并改进监理工作的短板环节为目的,论述了监理在变电站主控楼坡屋面挂瓦施工时需要采取的一系列控制措施,从而确保施工的安全及质量目标的实现。
To find and improve supervision board link,this paper discusses the supervision in the substation control building slope roof tile construction that needs to take a series of control measures,it ensures the safety of the construction and the realization of quality.