随着TBM施工技术在超长水工隧道中的大量运用,穿越有水河谷就成为不可避免的工程问题。本文以应急入连工程输水隧洞横穿天马河TBM施工为例,对施工过程中的技术问题和防水措施进行了研究,结论对类似工程具有借鉴价值。
Crossing water valley becomes an inevitable engineering problem with the massive application of TBM construction technology in super-long hydraulic tunnel. In the paper,Emergency Dalian Diversion Project water conveyance tunnel crossing through Tianma River TBM construction is adopted an example. Technology problem and water-proof measures in the construction process are studied. The construction has reference value on similar projects.