摘要
针对市政道路排水管道安装中存在的问题,从安装准备、安装过程、闭水试验、施工场地恢复等方面,阐述了市政道路排水管道安装质量的管理策略,从而保证道路排水系统的正常运行。
In light of municipal road drainage pipeline installation problems,starting from aspects of installation preparation,installation process,close water test and construction field restoration and other aspects,the paper describes municipal road drainage pipeline installation quality management strategies,so as to guarantee normal operation of the road drainage system.
出处
《山西建筑》
2016年第31期139-140,共2页
Shanxi Architecture
关键词
市政道路
排水管道
安装质量
闭水试验
municipal road
drainage pipeline
installation quality
close water test