期刊文献+

矿山井架天轮平台布置设计研究 被引量:3

Research on head sheave platform arrangement of mine head frame
下载PDF
导出
摘要 为了适应矿山井架设计,以甘肃新庄煤矿凿击井架例,提出用现行规范荷载工况组合对已有井架的分析方法,并对井架箕斗天轮和罐笼天轮垂直布置方式进行分析验证。研究结果表明:箕斗天轮与罐笼天轮垂直布置方式相较于常规布置方式只需进行局部加固即可满足使用要求,同时加固所需材料较少,大大减少对于地形的依赖性。 In order to adapt to mine head frame design, the paper proposed the analysis method for existing head frame with the load case combination of current specifications, and analyzed and verified the vertical arrangement method of the skip head sheave and cage head sheave. The results show that, the vertical arrangement skip head sheave and cage head sheave, comparing with conventional arrangement, can meet the requirements with partial reinforcement, which requires small amount of reinforcement material, and has strong applicability with the dependence of terrain greatly reduced.
出处 《煤炭工程》 北大核心 2016年第11期24-26,共3页 Coal Engineering
基金 河北省自然科学基金资助项目(E2010001012)
关键词 矿山井架 天轮平台 箕斗罐笼 垂直布置 mine head frame head sheave platform skip cage vertical arrangement
  • 相关文献

参考文献5

二级参考文献14

共引文献6

同被引文献13

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部