合肥华润万象城结构内缩层全钢爬架附着爬升技术 被引量:13

The Attached Climbing Technology Frame of the Whole Steel Climbing Frame in Hefei MIXC Inner Shrinking Layer
下载PDF
导出
摘要 合肥华润万象城项目东塔楼结构40层、48层层楼板结构内缩,全钢爬架无法附着及爬升,在工期紧张、施工难度较大、安全难题较高等复杂工况下。在结构内缩层处设计一种钢立柱转换系统,将原设置在楼板上的爬架导轨附着支座和爬升吊挂件固定在钢立柱上,实现了全钢爬架在结构内缩层处的爬升。工程应用证明,该钢立柱转换系统爬升方式施工安全,节省了工期,降低施工成本。 Because the floor structure of the 40 th and 48 th layers of East Tower in Hefei MIXC project shrink,the steel climbing frame can not be attached and climb under the tight deadlines,the larger difficulty of construction,higher security challenges and other complex conditions. A steel column at the conversion system is designed in the inner shrink layers,the climbing guide rail and the climbing hanging hanging pieces set on the floor originally,which achieve the climb of the whole steel climbing frames in the structure. Engineering applications show that the construction of the steel columns climbing mode of the conversion system is safe,which saves the time limit and reduces construction costs.
作者 郭伟超 孔闯
出处 《施工技术》 CAS 北大核心 2016年第20期112-116,共5页 Construction Technology
关键词 全钢爬架 爬升 钢立柱转换系统 固定附着支座 施工技术 steel climbing frame steel columns conversion system fixed attached supporting construction
  • 相关文献

参考文献7

二级参考文献30

  • 1中国建筑科学研究院.GB50010-2010混凝土结构设计规范[s].北京:中国建筑工业出版社,2010. 被引量:119
  • 2北京钢铁设计研究总院.GB50017-2003钢结构设计规范[S].北京:中国计划出版社.2003. 被引量:320
  • 3杨庆生,郑代华.高等计算力学[M].北京:科学出版社,2009. 被引量:4
  • 4北京钢铁设计研究总院.钢结构设计规范:GB50017-2003[S].北京:中国计划出版社,2003. 被引量:22
  • 5江苏江都建设工程有限公司.液压爬升模板工程技术规程:JGJ195-2010[S].北京:中国建筑工业出版社,2011. 被引量:1
  • 6江苏江都建设工程有限公司.液压爬升模板工程技术规程:JGJl95-2010[S].北京:中国建筑工业出版社,2011. 被引量:1
  • 7北京钢铁设计研究总院.钢结构设计规范:GB50017--2003[S].北京:中国计划出版社,2003. 被引量:12
  • 8胡玉银.超高层建筑施工[M].2版.北京:中国建筑工业出版社,2013. 被引量:1
  • 9建筑机械使用安全技术规程:JGJ33--2012[S].北京:中国建筑工业出版社,2012. 被引量:1
  • 10易伟建,张望喜.建筑结构试验[M].北京:中国建筑工业出版社,2000. 被引量:1

共引文献47

同被引文献48

引证文献13

二级引证文献43

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部