期刊文献+

基于积分制的变电外包施工优化管理

Optimal Management for Substation Outsourcing Construction Based on Integral System
下载PDF
导出
摘要 针对变电站外包施工经常存在的一些问题及解决措施进行了探讨。提出了以现场管控为重点,加强流程管控和过程管控,对发现问题及时有效纠偏、以积分制为抓手推进外包作业精细化管控等为内容的解决措施,取得较好的施工成效。 This paper mainly discusses the problems and solutions frequently existing in substation outsourcing construction, and puts forward the solving measures with on-site controls regarded as the key point-based, strengthening the process and program control, correcting deviation with discovered problems timely and effectively,and regarding integral system as research object to promote the lean management for outsourcing construction. And good results has been obtained in construction.
出处 《现代工业经济和信息化》 2016年第19期103-104,共2页 Modern Industrial Economy and Informationization
关键词 积分制 外包施工 现场评估 优化管理 integral system outsourcing construction site assessment optimal management
  • 相关文献

参考文献3

二级参考文献9

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部