摘要
结合西藏墨脱亚让水电站工程引水隧洞洞内泥石流塌方段处理施工,介绍了洞内塌方与泥石流形成过程,进行了原因分析,提出了针对性的处理措施,取得了较好的处理效果。
In combination with the handling construction of the mudslide collapse in the headrace tunnel of Motuoyarang Hydropower Project,Tibet, causes and process of the collapse and mudslide are described and analyzed. The handling measures are proposed on purpose.
作者
董功华
DONG Gonghua(China Hydro Consulting Engineering Corporation, Northwest Branch, Xi'an 710061,China)
出处
《西北水电》
2016年第5期44-46,62,共4页
Northwest Hydropower
关键词
有压隧洞
泥石流
处理方法
墨脱亚让水电站
pressure tunnel
mudslide
handling method
Motuoyarang Hydropower Project