7Lubka Tchankova. Risk identification – basic stage in risk management"[J].Environmental Management and Health,2002,(03):290-297. 被引量:1
8Tang WZ,Qiang MS,Duffield CF,Young DM,Lu YM. Risk management in the Chinese construction industry[J].Journal of Construction Engineering and Management,2007,(12):944-956. 被引量:1
9Sui Pheng Low,Junying Liu,Sarah He. External Risk Management Practices of Chinese Construction Firms in Singapore[J].KSCE Journal of Civil Engineering,2009,(02):85-95. 被引量:1
10Ning Yu,Yanfeng Wang. Risk Analysis of EPC Project Based on ISM[J].Emergency Management and Management Sciences,2011,(08):151-154. 被引量:1